Feasibility Study Results
Highlights ($1,200/oz Au; 3.1:1 Real:USD)
- Average annual gold production of 205,000 oz
- Proven & Probable Mineral Reserves of 3.8 million oz
- Post-Tax IRR of 26% ($1,200/oz Au)
- Post-Tax NPV of $665 million (5% discount rate)
- Average cash operating costs of $618/oz gold
- All-in sustaining cash costs of $779/oz gold
- Initial capital costs of $298 million (after tax) including pre-production costs and taxes
Estimated Project Schedule
Mining
The Feasibility Study considers open pit mining using a 100% owner-operated equipment fleet. The mine has been designed to deliver an initial 3.5 million tonnes per year (10,000 tonnes per day) of mill feed, expanding to full production of 7 million tonnes per year (20,000 tonnes per day) in Year 3. The Feasibility Study optimizes the mine plan for the early years of production with a delivered head grade of 1.30 g/t. Material from the last three months of pre-production stripping will be used to commission the process plant.
The average strip ratio for the life of the mine is estimated at 4.3:1. Open pit bench heights of 10 meters will be mined and ore hauled with 136-tonne haul trucks and matching loading equipment.
During the mining operation, a stockpile will be maintained adjacent to the primary crushing plant in the event of weather related mining interruptions Waste rock will be hauled to dedicated waste management facilities near the open pits.
Metallurgy
Extensive feasibility level test work was completed by SGS, using representative run-of-mine composites, that confirmed the material from the Volta Grande mineral deposits is amenable to a conventional crush, grind, gravity concentration, leach and carbon-in-pulp (CIP) flow sheet.
Test work results indicated that 40% to 50% of the gold will be recovered in a gravity concentrate. The overall estimated gold recovery based on all ore types being processed during the life of mine is 93%.
Mineral Reserves
The mineral reserves for the Volta Grande Gold Project are based on the conversion of measured and indicated mineral resources (see Mineral Resources section) within the current Feasibility Study mine plan. Measured mineral resources are converted directly to Proven mineral reserves and Indicated mineral resources to Probable reserves. The total fully diluted mineral reserves for the Volta Grande Project are as follows:
Classification | Tonnes(t) | Gold Grade g/t) | Contained Gold(oz) |
Proven | 41,757,000 | 1.07 | 1,442,000 |
Probable | 74,212,000 | 0.98 | 2,346,000 |
Proven + Probable | 115,969,000 | 1.02 | 3,788,000 |
**The above information was obtained from the Feasibility Study report for the Volta Grande Gold Project, which can be downloaded here. Please see cautionary notes and Qualified Person statement related to these results here.